Operational Continuity: During the retrofit project, we ensured that the factory’s operations and the production of valuable products were uninterrupted by the roofing renovation.
Watertight Roofing: Understanding the critical need for a 100% watertight roof, we selected the optimal work method, weather conditions, and site work procedures. A new layer of insulation board, vapor barrier, and TPO membrane were installed over the existing metal sheet to meet this stringent requirement.
Clean Room Integrity: The roofing renovation was executed with precision to prevent any disturbance or leakage that could affect the factory’s clean room, which houses highly valuable products and machinery.
Technical Calculations: We conducted precise loading and U-value calculations to ensure the roofing system’s performance met the high standards required for long-term durability.
Roofing System Performance: To fulfil the high-performance requirements, we supplied and installed a TPO membrane roofing system that complies with FM Global standards, ensuring longevity and reliability.
OvercomingChallenges: Our team of roofers and builders overcame various challenges to successfully deliver a robust LONGEVITY TPO roofing system to Micron, ensuring quality and efficiency throughout the process.